Summertime is not computer time for me. Lately, i have had bathroom tunnel vision. That means that for the past 7 days, I have done nothing but work on the bathroom downstairs in 167 9th. We moved in downstairs without the bathroom intact at all. Heres what the bathroom looked like as we were demolishing it (winter 06-07):

then... reframing (summer 07)....

new subfloor...

eventually...plumbing (sink, tub, washer/dryer, toilet) & drywall....

a small corner closet....

glass blocks as a window replacement...

stone tiles (and the old-fashioned sink)..

grouting sucks! (thanks for the help james)
and.... thats all for now folks. to be continued soon.



blog feed